Reducing the losses resulting from upplanned equipment downtime is critical to uptime and increasing overall productivity as it can lower the loss cost. the objective of this research was to propose a solution to reduce the losses arising from unplanned downtime in the shaft assembly. This mixed methods research design was performed. Quantitative data collection was carried out with a sample of 140 repondents who took a survey,