Aggregate production planning when operating time, costs, customer demand, labor level, and machine capacity are
uncertain is studied. This study optimizes the aggregate production plan, yielding the minimum total costs by using an integrated
fuzzy multi-objective linear model with 𝛼-Cut analysis. The proposed integrated approach simultaneously minimizes the most
possible value of the total costs, maximizes the possibility of obtaining the lowest total costs, and minimizes the possibility of
obtaining higher total costs as multiple objectives. Then, the α-Cut analysis is introduced to ensure decision makers that the outcome
satisfies their preferences based on a specified minimum allowed satisfaction value (α). The outcome of the study can show a
possible range of total costs, yielding an optimal and acceptable plan under uncertainty.
Keywords
production planning, possibilistic linear programming, fuzzy goal programming, ?-cut analysis
SONGKLANAKARIN JOURNAL OF SCIENCE & TECHNOLOGY
Published by : Prince of Songkla University Contributions welcome at : http://rdo.psu.ac.th
By using our website, you acknowledge that you have read and understand our Cookie Policy and Privacy Policy.